P drop | Train | Validation | Test | |||
---|---|---|---|---|---|---|
 | Cost | Acc.% | Cost | Acc.% | Cost | Acc.% |
0 | 0.651 | 74.43 | 0.726 | 71.48 | 0.733 | 70.98 |
0.1 | 0.634 | 75.02 | 0.736 | 71.25 | 0.745 | 70.25 |
0.2 | 0.669 | 73.69 | 0.708 | 72.19 | 0.721 | 71.25 |
0.3 | 0.601 | 76.10 | 0.704 | 73.01 | 0.721 | 72.10 |
0.4 | 0.668 | 73.37 | 0.692 | 73.43 | 0.701 | 72.44 |
0.5 | 0.702 | 72.12 | 0.726 | 71.51 | 0.741 | 70.91 |
0.6 | 0.734 | 71.06 | 0.723 | 71.78 | 0.735 | 70.91 |